Project Overview:

High end full electrical design and instillation to a 7 bed house in a rural location. Including smart lighting controls and low energy light fittings both internally and to the external spaces.

Scope of Work:

  • Design
  • Temporary supplies to the Intruder and Fire Alarms
  • Upgraded UKKPN supply
  • Upgraded external kiosk and introduced additional submain kiosk positions
  • LV and ELV containment throughout the building
  • Multiple new submains throughout the building to strategically positioned distribution boards
  • Removed of historic cabling and electrical systems
  • Instillation of a new MCCB panel, new single-phase consumer units and new three-phase consumer units
  • Smart lighting systems (Lutron lighting system)
  • Upgrade of main earthing and bonding cables
  • Installation of small power
  • Installation of new data infrastructure
  • Full bespoke AV systems including Europe’s largest privately owned Organ
  • Installations of small domestic Cinema
  • Upon completion an Electrical Installation Report

We are delivering results:

G M Monk’s team of expert installation engineers and specialist contractors have been working in conjunction to carry out an astounding install. This project is still on going with a predicted completion date of Mid-January 2021.