Project Description

Scope of Work

Chantry CP School main electrical intake upgrade works

These works were designed and planned over a 3 week period working with UKPN on the safe isolation of the school.

The existing electrical layout was 40 years old with many adaptations over the years. The main intake was re-designed to allow for future capacity with restrictions on space.

A new MCCB panel board and 3 phase local Distribution was installed, incorporating all the existing circuits with 30ma RCD protection.