01323 841769

enquiries@gmmonk.co.uk

Replacement Lighting and Distribution Boards at The Weald Swimming Pool

Home Local Authority Replacement Lighting and Distribution Boards at The Weald Swimming Pool
Home Local Authority Replacement Lighting and Distribution Boards at The Weald Swimming Pool

Replacement Lighting and Distribution Boards at The Weald Swimming Pool

G M Monk Ltd acted as the Main Contractor for this project and oversaw all electrical and minor building works that were required.  As the Leisure Centre remained operational whilst the works were in progress, full site security and signage was vital together with full Construction Phases Health and Safety Plan to ensure the safety of all workers and users of the Leisure Centre.  The majority of these works were at high level to install a new lighting system above the pool.  The installation included specialist lighting and containment to prevent corrosion.  The pool was closed during this element of the work so we had an extremely tight timeframe to ensure the works were completed.  The second stage of these works was to upgrade the main rooms and removal of all old equipment and replace with new. The project was completed on time with minimum disruption to the Leisure Centre.